5D20E21B-0B03-4470-94B7-202905EF1E216F58721B-2383-4B77-9E7D-A6F1A191FA88AD3CE729-6712-49A4-9AC7-9A6C03C30F7F
Posted on

Underway: Sabot at Stony Point, Phase 1

Work is now underway at Sabot at Stony Point School in Richmond. 3north worked with the school on an overall master plan guided by the firm’s proprietary IQ (Intangible Qualities) process. The building under construction now is Founders’ Hall, a multi-purpose building, which will be adjacent to the original 1925 house, home to the school.